Medelec Switchgear, together with their principals Schneider Electric, supplied and commissioned two panels to the existing 33 kV switchboard at the Distribution Centre situated near the Malta Freeport in Birzebbuga. The planning and preparations took several months and the execution of the project on site lasted 4 days, where the technical staff from Enemalta, under the leadership of Ing Benjamin Pavia assisted the Schneider Electric installation engineer Mohamed Ibraheem for the successful completion of this project.